Mohave County Land Without Utilities: What Buyers Should Verify

Mohave County Parcels Without Utilities: Buyer Questions and Development Facts to Verify

Considering a sale of a Mohave County parcel without installed utilities calls for a clear distinction between the property’s documented current condition and questions a prospective buyer must verify for a planned use. This guide from Ultimate Land Deals is intended to help owners organize those questions without presenting an unverified development outcome as a fact.

Start with documented current conditions

Prepare a short, factual summary using records and materials you already have. Keep known conditions separate from assumptions about future development.

  • Parcel identity: APN, legal description, and acreage shown in your records.
  • Installed improvements: State whether you know of installed water, sewer, electric, gas, well, or septic improvements on the parcel.
  • Documents in hand: Include relevant utility correspondence, surveys, site plans, septic materials, title materials, or prior agency correspondence.
  • Questions for a buyer to verify: Water source, wastewater options, electric service, access, zoning, floodplain information, and permits for the buyer’s intended use.

For example, a visible utility line or a nearby home can be noted as an observation, but it should not be described as confirmation that the subject parcel can receive service or support a particular system.

Check whether the Arizona disclosure affidavit applies

Arizona’s land-division disclosure statute applies to specified transfers: a seller of five or fewer non-subdivided parcels in an unincorporated county area must furnish the prescribed affidavit to the buyer at least seven days before transfer. The statute provides a five-day rescission period after the affidavit is furnished and requires the executed affidavit to be recorded with the deed. A.R.S. § 33-422 also includes disclosures concerning access, roads, floodplain status, utilities, water, wastewater, zoning, and certain land-division matters.

The statute has stated conditions, so confirm how it applies to the particular parcel and transaction before relying on the form.

Development questions a buyer may need to investigate

Mohave County’s checklist for a one- or two-family residential dwelling lists permit-application prerequisites that include approved zoning or a zoning-use permit, property floodplain information, a well permit or approved water source, and septic approval or a sewer-acceptance letter. These are items in the County’s building-permit process. Mohave County’s residential dwelling permit checklist is a useful starting point for a buyer considering a dwelling.

For onsite wastewater systems, Mohave County processes site investigations, applications, plans, construction authorizations, inspections, and discharge authorizations. The County states that septic construction may not begin until the construction authorization has been signed, and that a site investigation provides information used to select and size a system. The County also states that a well and septic system must be separated by at least 100 feet, including from a neighboring septic system. See Mohave County Septic & Well Permitting.

Compare prospective buyers with practical questions

Different buyers may be considering different future uses. Rather than assuming what a buyer has confirmed, ask direct questions before evaluating an offer.

Question Why ask it?
What is the buyer’s intended use for the parcel? It identifies which development questions the buyer may need to investigate.
Which property documents has the buyer reviewed? It helps keep discussions tied to the materials actually available.
Is the buyer relying on an assumption about water, septic, electric service, access, or zoning? It identifies assumptions that should be checked before they become sales claims.
What due-diligence period is requested in the written offer? It clarifies the buyer’s proposed review timeline.
Does the written offer include assignment language or other conditions? It allows the owner to review the actual proposed terms.

A concise property packet

A property packet can make the present record easier for prospective buyers to review. Consider including:

  1. APN and legal description.
  2. Copies of documents you possess relating to access, utilities, water, septic, surveys, or prior agency communications.
  3. Current photos, labeled as photos rather than proof of service availability or development approval.
  4. A statement of known installed improvements and questions that remain to be verified for a proposed use.
  5. Any disclosure materials required for the transaction after confirming their applicability.

FAQs

Does A.R.S. § 33-422 apply to every Mohave County land sale?

No. The statute identifies particular conditions, including transfers of five or fewer non-subdivided parcels in an unincorporated county area. Review the statutory conditions for the parcel and transaction at A.R.S. § 33-422.

What should a buyer check before planning a home on the parcel?

For a proposed one- or two-family dwelling, the County checklist identifies zoning or zoning-use approval, floodplain information, a well permit or approved water source, and septic approval or a sewer-acceptance letter among the permit-application prerequisites. The buyer should verify requirements for the specific parcel and project with the relevant agencies. Mohave County residential dwelling permit checklist

What septic information is useful to provide?

Provide any septic permit, site-investigation material, plan, authorization, or related correspondence you possess. Mohave County states that site investigations provide information used to select and size an onsite wastewater system, and that construction may not begin before signed construction authorization. Mohave County Septic & Well Permitting

Sources

Related Articles

Keep reading other bits of knowledge from our team.

Request Info

Have a question about this article or want to learn more?